Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

Stuck jobs should not include lower priority jobs

#4

A job will be considered stuck if you end up adding a series of higher priority jobs on top of it. The system needs to know that if the job is at a lower priority it isn't really stuck.

Reported by jgeiger · December 4th, 2008 @ 02:26 PM

State: open
Milestone: 2.x
Assigned to: jgeiger jgeiger

Activity

  1. jgeiger
    jgeiger
    • State changed from new to open
    • Milestone changed from 1.x to 2.x

    February 18th, 2009 @ 02:01 PM

Please Sign in or create a free account to add a new ticket.

With your very own profile, you can contribute to projects, track your activity, watch tickets, receive and update tickets through your email and much more.