Lighthouse has a new layout. Prefer the old one? Return to the old layout, and switch back any time from the link at the top of each page.

jgeiger's latest activity

Wednesday, February 04 2009
18 Allow multiple stage searches with dynamically created databases was created in ViPDAC
  • jgeiger
    jgeiger created the ticket at 9:19 AM

    Some searches can be run quickly on a large database, which will create a sub-database upon which a more detailed search can be run.

    This should significantly s...

17 Create results file model/controller was created in ViPDAC
  • jgeiger
    jgeiger created the ticket at 9:15 AM

    To allow result files to be deleted and analyzed easier, create a separate model/controller to allow their download and removal as needed. We can also persist t...

9 Upload datafiles individually was updated in ViPDAC
  • jgeiger
    • Tag changed from datafile, persist, results to datafile, persist
    • Title changed from Ability to reanalyze existing datasets? to Upload datafiles individually
    by jgeiger at 9:14 AM

    Changing the name to split the data file and result file issues into 2 tickets.

Tuesday, February 03 2009
16 See info on parameter file when creating new job was updated in ViPDAC
  • jgeiger
    • Tag set to interface, useability
    • State changed from new to open
    • Milestone set to feature
    by jgeiger at 11:04 AM
13 Track cluster details for a given job was updated in ViPDAC
  • jgeiger
    • Tag set to statistics
    • State changed from new to open
    • Milestone set to feature
    by jgeiger at 11:03 AM

    This is part of the statistics for the csv file analysis.

15 Download job stats as CSV? was updated in ViPDAC
  • jgeiger
    • Tag changed from analysis, data, performance to analysis, data, performance, statistics
    • Milestone set to feature
    by jgeiger at 11:02 AM
9 Ability to reanalyze existing datasets? was updated in ViPDAC
  • jgeiger
    • Tag set to datafile, persist, results
    • Milestone set to high priority
    by jgeiger at 11:02 AM

    This feature is important from the standpoint that it will parallel the creation of a results file model/controller that will allow the data and results files t...

Monday, February 02 2009
high priority was updated by jgeiger in ViPDAC at 9:46 AM 1 more event
 
2 of 6 tickets remain in this milestone
feature was updated by jgeiger in ViPDAC at 9:46 AM
 
6 of 6 tickets remain in this milestone